Timber floors have been sanded and polished, there were plastic bags full of saw dust outside.

Dining Area

Kitchen applicances have been installed, Oven, Induction Stove (In photo) and concealed Rangehood.

View from Dining Room to front of house

Fireplace has been set up, logs are in place - still not chimney though...........?

This is the view of the entrance to my Ensuite, towel rails are installed.

Big water tank installed (it was raining while we were there and we could hear it filling up!) Still not sure why the need for a WARNING sticker about rain water, and why stick it at the front, so ugly!

Our ducted air con - thing?

Roof gables have been filled in with timber batterns

And the sun came out as we were leaving.....


The gorgeous valley on a sunday afternoon.



GO ROAR!!!!!!!!